Posted on November 2, 2016 at 9:07 AM by Saja Aures
Crews continue to work on utility connections at the intersection of President Street and the new General McIntosh Blvd. The 24” water main core under President Street is complete. Water lines are being flushed and tested before the water valve control station and building is constructed.
On the south side of President Street, all the utility lines are installed with a couple of connections to be completed.
Material is currently placed and compacted for the new elevated roadway. The next phase of construction will include a traffic lane shift on President Street. Four lanes of traffic will be maintained during the traffic shift.
Fill being placed on the south side of President Street
Fill being compacted on the south side of President Street