Crews have completed a significant section of 48” gravity sanitary sewer main on the south side of President Street near its intersection with General McIntosh.  The remaining section of 48” sewer main will be completed and tied into the existing sewer main in this location once traffic is shifted to the south side of President Street in the next few months.  

Crews are currently installing stormwater drainage lines along the new General McIntosh alignment between President Street and Randolph Street. Once these storm lines are complete, work will begin on the water main along this same section of roadway in preparation for paving.

Installation of storm pipe along new General McIntosh Blvd.:

070716_pic1.jpg


070716_pic2.jpg

070716_pic3.jpg

070716_pic4.jpg
Installation of pipe support system for storm pipe along new General McIntosh Blvd.