Fire Marshal required plan review documents.
8-
Fire Marshal required plan review documents.
Access/Egress control Systems and plans shall be per NFPA 101, NFPA 70, and NFPA 72, as amended by the State of Georgia with applicable 120-3-3.
Required documents listed below for new installs:
- Submit your current low voltage license issued by the state of GA.
- Installation drawings (to include wire diagrams and correct symbols)
- Product submittal
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being removed/replaced or altered.
- Product submittal
Access/Egress control system demo:
Required documents listed below:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being removed/replaced or altered.
-
Fire Marshal required plan review documents.
Two-way Area of Refuge Systems and plans shall be per NFPA 101 and NFPA 72, as amended by the State of Georgia with applicable 120-3-3.
Required documents listed below for new installs:
- Submit your current low voltage license issued by the state of GA.
- Scaled installation drawings (to include correct NFPA 170 symbols, complete riser diagram, correct circuit labels)
- Battery calculations
- Product submittal package (to include signage package)
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being removed/replaced or altered.
- Product submittal
Two-way Area of Refuge system demo:
Required documents listed below:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being removed/replaced or altered.
-
Fire Marshal required plan review documents.
Click to Enter Systems and plans shall be per NFPA 70, and City of Savannah ordinances.
Required documents listed below:
• Submit your current low voltage license issued by the state of GA.
• Detailed installation drawings
• Secondary power
• Product submittal package.
Required documents listed below for alterations/repairs/modifications of existing systems:
• Submit your current low voltage license issued by the state of GA.
• Detailed plan to show what is being removed/replaced or altered.
• Product submittal
Click to enter Demo:
Required documents listed below:
• Submit your current low voltage license issued by the state of GA.
• Plan to show what area of the system are being removed/replaced or altered.
-
Fire Marshal required plan review documents.
Emergency Radio Systems (BDA) plans shall be per IFC, NFPA 1221, NFPA 70, and NFPA 72, as amended by the State of Georgia with applicable 120-3-3.
Required documents listed below for new installs:
- Submit your current low voltage license, issued by the state of GA.
- Submit your current FCC, GROL license, Issued by the Federal Government.
- Stamped electrical Installation drawings (to include wire diagrams and correct symbols)
- Product submittal
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current low voltage license issued by the state of GA.
- Submit you current FCC license, Issued by the Federal Government.
- Floor plan to show what area of the system are being removed/replaced or altered.
- Product submittal
Emergency Radio System (BDA) Demo:
Required documents listed below:
• Submit your current low voltage license issued by the state of GA.
• Submit you current FCC license, Issued by the Federal Government.
• Floor plan to show what area of the system are being removed/replaced or altered.
-
Fire Marshal required plan review documents.
Fire Alarm Systems and plans shall be per NFPA 72, as amended by the State of Georgia with applicable 120-3-3.
Required documents listed below for new installs:
- Submit your current low voltage license issued by the state of GA.
- Scaled installation drawings (to include correct NFPA 170 fire alarm symbols, complete riser diagram, complete operation matrix, correct notification appliance circuit labels)
- Battery calculations (to include notification appliance circuit layout by circuit)
- Product submittal package.
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being affected.
- Battery Calculations if applicable
- Product submittal
Fire alarm system demo:
Required documents listed below:
- Submit your current sprinkler license issued by the state of GA.
- Floor plan to show what area of the system are being removed/replaced or altered.
-
Fire Marshal required plan review documents.
Fire Sprinkler Systems and plans shall be per NFPA 13, 13D, or 13R as amended by the State of Georgia with applicable 120-3-3.
Required documents listed below for new installs:
- Submit your current sprinkler license issued by the state of GA.
- Flow test for hydraulically calculated systems (less than 6 months)
- Approved site utility for new installed systems.
- Scaled installation drawings (to include piping and reflected ceiling)
- Necessary hydraulic calculations
- Product submittal package
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current low voltage license issued by the state of GA.
- Scaled installation drawings (to include piping and reflected ceiling)
- Product submittals.
Fire sprinkler system demo:
Required documents in the order listed below:
- Submit your current sprinkler license issued by the state of GA.
- Floor plan to show what area of the system are being demolished and/or replaced.
-
Fire Marshal required plan review documents.
All installations of fire suppression systems shall, where applicable, be installed in compliance with one of the following: NFPA 17 2017 edition or 17A 2013 edition and U.L. 300, or NFPA 12, or NFPA 12A, or NFPA 13, or NFPA 2001 as amended by the State of Georgia with applicable 120-3-3.
Required documents listed below for new install:
- Submit your current fire suppression license issued by the state of GA.
- Scaled drawings indicating appliances and hoods or rooms and equipment to be protected
- Product submittal package
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current fire suppression license issued by the state of GA.
- Plans to show what part of the system are being affected.
- Product submittal
Suppression system demo:
Required documents listed below:
- Submit your current fire suppression license issued by the state of GA.
- Floor plan to show what area of the system are being demolished and replaced.
-
Fire Marshal required plan review documents.
Gas Detection Systems and plans shall be per NFPA 72, and NFPA 720 as amended by the State of Georgia with applicable 120-3-3
Required documents listed below:
- Submit your current low voltage license issued by the state of GA.
- Scaled installation drawings (to include correct NFPA 170 symbols, complete riser diagram, complete operation matrix, correct notification appliance circuit labels)
- Secondary power calculations (where required by NFPA 720)
- Product submittal package.
Required documents listed below for alterations/repairs/modifications of existing systems:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being removed/replaced or altered.
- Product submittal
Gas Detection System demo:
Required documents listed below:
- Submit your current low voltage license issued by the state of GA.
- Floor plan to show what area of the system are being demolished and replaced.