Click to Home

Go To Search
Home
RSSPrintEmail
Sidewalks
 sidewalks
 ada ramps
  • Bay Street  Reconstruction Crosswalk - $550,918
    Bay Street is the main thoroughfare in the Historic District, carrying over 25,000 vehicles daily. The City installed stamped brick crosswalks and advance walk signals to allow pedestrians to begin crossing before vehicles are signaled and brick crosswalks at the signalized intersections. The pedestrian signal buttons were upgraded with audible prompts to provide greater accessibility to the blind and visually-impaired. 
  • ADA Ramps - $426,857
    Limited right-of-way, unique street-level architectural features and the concerns of careful stewardship of the Historic District, all contributed over time to limiting the accessibility of sidewalks in the area. To address this serious concern in the most comprehensive manner possible, over a two-year period the City installed 1,460 ramps making all sidewalks in the Historic District compliant with the Americans with Disabilities Act.
  • Liberty Parkway Sidewalks - $295,033
  • Eastside Sidewalks - $583,668
  • Hudson Hill Sidewalks - $93,612
  • West 41st Street Sidewalks - $49,430
  • Edgemere/Sackville Curbing - $97,490
  • Liberty Parkway Sidewalks - $295,033
  • Eastside Sidewalks - $583,668
  • Hudson Hill Sidewalks - $93,612
  • West 41st Street Sidewalks - $49,430
  • Edgemere/Sackville Curbing - $97,490
 Complete Sidewalks Project List
Forsyth & Daffin Sidewalk Replacement  $    10,000 Hazardous Sidewalk Repair  $       7,251
Liberty Parkway Sidewalk  $   295,033 Eastside Sidewalks  $     17,268
School Sidewalks-Phase 1  $    28,842 1% Sidewalk Construction  $    674,423
Windsor Forest School Sidewalks  $    19,690 Wheelchair Access Ramps  $          735
Juliette Lowe School Sidewalks  $    23,690 Cuyler-Brownsville Sidewalk  $     23,265
Spencer, Bartow, Hodge School Sidewalks  $    26,118 1% Sidewalk Construction  $    808,309
Heard, Smith School Sidewalks  $      6,204 Cann Park Sidewalks  $    222,104
Haven, Pulaski School Sidewalks  $           96 Gordonston Sidewalk Improvements  $     84,597
Largo-Tibet School Sidewalks  $    31,948 Historic District-ADA Ramps  $    315,971
Habersham Street Sidewalks  $    69,209 State Routes ADA Ramps  $    110,886
Whitebluff Sidewalks  $    69,305 President St./General McIntosh Sidewalk  $     43,097
Eastside Sidewalks  $   483,510 Bay Street Reconstruction Crosswalk  $    550,918
WB Elementary Sidewalks  $    82,864 1% Sidewalk Construction-Phase 2  $    674,584
Thomas Square Sidewalks  $         907 1% Sidewalk Construction  $    259,828
Richards Street Sidewalks  $      1,534 Metro Sidewalk West 41st Street  $     49,430
Stillwood & Butler Sidewalks  $    57,514 Eastside Sidewalk Access  $    100,158
Forsyth Sidewalks-Phase II  $    11,766 Hudson Hill Sidewalk Improvements  $     93,612
Hazardous Sidewalk Repair  $         358 Metro Sidewalk West 41st Street  $     49,430
Liberty Parkway Sidewalk  $    48,322
 
 
sgtv