Cemetery Drainage Improvements



spacer
Cemetery Drainage Improvements

Storm drains from Section N and around the entrance of Bonaventure Cemetery were replaced with appropriate fixtures to improve drainage into Placentia Canal. Historically significant, 250-year old live oak trees were preserved during the construction process. The asphalt roadway over the new system was replaced. An eroded portion of the Wilmington River Bluff in Greenwich Cemetery was also stabilized with rip rap installed on the slope to protect the bluff from natural elements. This was the final phase of a multi-year project.

Bonaventure Administrative Building Conservation
Bonaventure Water Line Replacement
Cemetery Drainage Improvements
Cemetery Entrance Improvements
Cemetery Monument Conservation (Colonial Bronze Eagle)
Cemetery Monument Conservation (Public Holding Vault)
Cemetery Roadway Improvements
Cemetery Security Improvements
Cemetery Sidewalk Improvements
Colonial Cemetery Conservation
Colonial Cemetery Repairs
Greenwich Cemetery Drainage
Greenwich Cemetery Expansion Design
Greenwich Park Development Design
Greenwich Statuary Conservation
Laurel Grove Administrative Building Conservation
Laurel Grove Cemetery Perimeter Fencing
Section T Development